Work items
Work items turn the rows of an ordinary table into tracked work. Each row gets a key such as ZAD-12, a type, a priority, a status, people and dates, and it can sit under a parent and wait for other rows that block it. Every one of these is a normal column of the table, so the Kanban board, the grid and the record window all show the same values.
The words are general on purpose: an Initiative, a Request, a Task, an Issue and a Subtask read the same to a transport company, a clinic or an accounting office.
This page covers turning work tracking on and every field it adds. Subtasks, the hierarchy, blockers and links between items are on Subtasks, blockers and links.
Before you start
- Work items are part of every plan and work on any table.
- Turning tracking on adds columns to the table, so it needs edit rights on the table (members and admins).
- The status of a work item is a single select or classification column. A board stacked by a multi select column cannot track work: "Stack the board by a single-select field first (Stacked by)."
Turn work tracking on
There are three ways in, and all three do the same to the table.
| Where | How |
|---|---|
| A new board | In New Kanban board, when the table has no keys yet, fill in Key prefix and keep Track as work items (type, priority, parent, blockers) on. Switch it off to add only the key; the other fields can follow later from the board. |
| An existing board | Click Track work in the header, or Turn on in the Track work on this board banner. |
| The grid | In the table's menu, choose Track work items. Once the table tracks work, the same entry reads Work item columns and adds whatever is still missing. |
The dialog Track work on this board: "Every card becomes a work item with a key, a type, a priority and a place in the hierarchy. The fields are added to the table, so the grid and the record show them too."
- Check the Key prefix. The dialog suggests one from the table's name and shows the numbering, for example "Cards will be numbered ZT-1, ZT-2, ZT-3... Set once - it cannot be changed later."
- Under Fields ("Each one is a column on the table. Uncheck what you do not need."), untick what you do not need. Start date and Reporter start unticked. The board's stacking column becomes the status ("Status: “Status”").
- Under Type and Priority, the dialog shows the options it adds, with their icons.
- Click Turn on. "Work tracking is on".
Columns that already fit are reused rather than added a second time: "Columns that already fit (a matching name and type, the people column, the only long text) are reused, not duplicated." A field the table already has is marked exists. Existing rows get their keys at once. Turning tracking on is one step in the table's Undo history.
The key prefix
The prefix is 2 to 10 capital letters or digits and starts with a letter ("2-10 letters or digits, starting with a letter"). Quanty suggests one from the table's name: the first letters of each word of a name of several words, otherwise the start of the word. Names that say nothing, such as "Table 1", are skipped in favour of the project's or the board's name.
Each new row takes the next number. A number is given once and never reused, even when its row is deleted.
The prefix is set once
"Set once - it cannot be changed later." Keys end up in messages, comments and documents, and a new prefix would leave all of them pointing nowhere. Afterwards the dialogs and the column settings show the prefix read-only: "Set when the table started tracking work. It stays, so keys already shared keep working."
The fields
Each field is one column of the table, and a table has at most one column per field.
| Field | Column type | What it holds |
|---|---|---|
| Key | Autonumber with the prefix | ZAD-12, shown on cards, in the grid, in links and in exports. |
| Type | Single select | Initiative, Request, Task, Issue or Subtask, each with its own icon. |
| Priority | Single select | Highest, High, Medium, Low, Lowest. |
| Status | Single select or classification | The column the board is stacked by. New tables get To Do, In Progress and Done. |
| Parent | Link to a row of the same table | The item this one belongs to. |
| Blocked by | Links to rows of the same table | The items that have to be done first. |
| Relates to, Duplicates, Causes | Links to rows of the same table | Other links between items. Each column is added the first time someone uses that kind of link. |
| Labels | Multi select | Free tags. Type a new one in the picker to create it. |
| Flagged | Checkbox | A flag that makes the card stand out. |
| Description | Long text | Markdown, edited in the record window ("Describe the work. Markdown works."). |
| Start date, Due date | Date | The due date drives Overdue and Due soon. |
| Assignee | Person | Who does the work. The board shows their face. |
| Reporter | Created by | Filled in by itself with the person who added the row. |
New columns are named in your interface language. In the grid, a column that plays one of these parts carries a badge such as "Work item: Priority".
Types and priorities
| Type | Icon colour | Typical use |
|---|---|---|
| Initiative | Purple | A larger goal with items under it. |
| Request | Green | Something someone asked for. |
| Task | Blue | A piece of work. |
| Issue | Red | Something that went wrong. |
| Subtask | Cyan | A step of a bigger item. |
| Priority | Colour |
|---|---|
| Highest | Red |
| High | Orange |
| Medium | Amber |
| Low | Blue |
| Lowest | Cyan |
The option labels are your table's data: rename them freely. The icon stays with the option, so a type column that says "Reklamacja" instead of "Issue" still draws the issue icon. An existing select whose options read like types or priorities, in English, Polish or German, is recognised when tracking is turned on.
When you create a single select column yourself, its settings offer Start from: Priority or Work type fills in the options with their icons and colours and makes the column the table's priority or type ("Adds the options with their icons and colours, and makes this column the table's Priority."). If the table has one already, the preset says "This table already has a Priority column."
Status and done
The status labels belong to your table, so Quanty never crosses a card out. It only needs to know which options mean finished: an option that reads as done (Done, Gotowe, Zrobione, Erledigt, Fertig, Closed, Resolved, Completed and similar), otherwise the last option of the column. That decides:
- the progress of a parent ("2 of 5 done");
- whether a blocked item is ready ("Ready to start. Every blocker is done.");
- which items can be Overdue (a finished item never is).
On the card
A board that tracks work draws these on every card, outside the 8 fields you choose in Customize cards:
| Part | Example |
|---|---|
| Type icon and key | the task icon and ZAD-3 |
| Priority | an arrow in the priority's colour ("Priority: High") |
| Parent | a chip with the parent's key and title |
| Progress | a bar with "1/3" on an item with children |
| Blocked | "Blocked by ZAD-8", or "Blocked by 2 items" |
| Labels | coloured chips |
| Flag | a flag, and the card turns amber |
| Due date | "Due 12 Nov 2026", or "Overdue since 3 Nov 2026" in red |
| Assignee | the face of the person |
| Comments | the number of comments |
The priority on a card is a button: click it to Set priority without opening the record.
In the grid
- Every field is an ordinary column: sort, filter and hide it as any other (see The grid).
- A table with a parent column gets a Hierarchy button: "Show rows under their parent items". Each parent row then has Show sub-items / Hide sub-items.
- In the settings of a key column, Key prefix ("e.g. KAN") reads "Rows read as KAN-12. Leave empty for plain numbers." Once set, it is fixed: "Set when the table started tracking work. It cannot be changed, so keys already shared keep pointing to the right row."
Good to know
- Turning it on twice is safe. Turning tracking on again only adds what is missing.
- Nothing is hidden from the table. Every field is a column; deleting one removes that part of tracking, and the other parts keep working.
- Keys travel. A link to a work item pasted in Chat, a comment or a document shows as a chip with its key, title and status (see Subtasks, blockers and links).
- No Jira words. The types are Initiative, Request, Task, Issue and Subtask.
Related pages
- Subtasks, blockers and links: parents, the hierarchy view, blockers and links.
- Kanban boards: the board the work items move on.
- Filtering a board: Type, Priority, Labels, Blocked, Flagged, Overdue and Due soon.
- Column types: the columns the fields are made of.